Infrastructure Move - Independent Provider of Consultancy Services

telent were asked to assist the company with the move of a storage system and related equipment from one office to a new rack in a separate office.

The requirement was to manage the move of all designated hardware, ensuring that the HPE 3PAR storage system was correctly decommissioned and recommissioned, and that the UPS and LAN switches were racked as required.

For transportation company vans fitted with hydraulic tail lifts were used. As well as transporting the hardware, telent oversaw the installation of two new Brocade SAN switches as part of the project to provide connectivity to the newly relocated 3PAR.